Skip to content

Deployment

Safe deployment strategies and procedures for DotClaude configurations.

Deployment Philosophy

Safety First Approach

All DotClaude deployments follow these principles:

  • Non-Destructive - Never overwrite without backup
  • Reversible - Always provide rollback capability
  • Incremental - Apply changes gradually
  • Validated - Test before system-wide deployment

Deployment Stages

  1. Preparation - Environment setup and validation
  2. Backup - Preserve existing configurations
  3. Testing - Validate in isolated environment
  4. Application - Deploy configurations safely
  5. Verification - Confirm successful deployment
  6. Documentation - Record changes and procedures

Deployment Methods

Individual Package Deployment

Deploy specific packages independently:

bash
# Single package deployment
./scripts/stow-package.sh git

# With explicit testing
./scripts/test-config.sh git
./scripts/stow-package.sh git
./scripts/health-check.sh

Progressive Deployment

Apply packages in logical order:

bash
# Phase 1: Foundation
./scripts/stow-package.sh environment
./scripts/stow-package.sh aliases

# Phase 2: Core Tools  
./scripts/stow-package.sh git
./scripts/stow-package.sh zsh

# Phase 3: Advanced Features
./scripts/stow-package.sh tmux
./scripts/stow-package.sh neovim

Full System Deployment

Complete DotClaude installation:

bash
# Automated full deployment
./scripts/deploy-all.sh

# Manual full deployment
for package in environment aliases git zsh tmux neovim; do
    ./scripts/stow-package.sh "$package"
done

Pre-Deployment Checklist

System Requirements

  • [ ] GNU Stow installed
  • [ ] Git available
  • [ ] Target shell (zsh) installed
  • [ ] Required dependencies present

Environment Validation

  • [ ] Backup space available
  • [ ] User permissions sufficient
  • [ ] No conflicting processes running
  • [ ] System stability confirmed

Configuration Readiness

  • [ ] Package integrity verified
  • [ ] Dependencies resolved
  • [ ] Conflicts identified and planned
  • [ ] Rollback procedures tested

Deployment Procedures

Standard Deployment Process

  1. Pre-flight Check

    bash
    ./scripts/health-check.sh --pre-deploy
  2. Create Backup

    bash
    ./scripts/backup.sh
  3. Test Configuration

    bash
    ./scripts/test-config.sh <package>
  4. Deploy Package

    bash
    ./scripts/stow-package.sh <package>
  5. Verify Deployment

    bash
    ./scripts/health-check.sh --post-deploy

Emergency Deployment

For urgent fixes or critical updates:

bash
# Quick deployment with minimal testing
./scripts/backup.sh
./scripts/stow-package.sh <package> --force
./scripts/health-check.sh --quick

Environment-Specific Deployments

Development Environment

  • Full feature set enabled
  • Debug logging active
  • Extensive testing
  • Regular backup cycles
bash
export DOTCLAUDE_ENV=development
./scripts/deploy-all.sh --dev-mode

Production Environment

  • Stable configurations only
  • Minimal logging
  • Conservative feature set
  • Automated backup scheduling
bash
export DOTCLAUDE_ENV=production
./scripts/deploy-all.sh --production

Testing Environment

  • Isolated deployment
  • Experimental features
  • Comprehensive logging
  • Easy rollback
bash
export DOTCLAUDE_ENV=testing
./scripts/deploy-all.sh --test-mode

Deployment Strategies

Blue-Green Deployment

Maintain two complete environments:

bash
# Deploy to green environment
./scripts/deploy-to-env.sh green

# Test green environment
./scripts/test-env.sh green

# Switch to green environment
./scripts/switch-env.sh green

# Remove blue environment
./scripts/cleanup-env.sh blue

Rolling Deployment

Apply changes gradually across packages:

bash
# Deploy packages one at a time
for package in "${packages[@]}"; do
    ./scripts/deploy-package.sh "$package"
    ./scripts/verify-package.sh "$package"
    sleep 5  # Allow stabilization
done

Canary Deployment

Test with subset of functionality:

bash
# Deploy to limited scope
./scripts/deploy-canary.sh --packages="git,aliases"

# Monitor and validate
./scripts/monitor-canary.sh

# Full deployment if successful
./scripts/promote-canary.sh

Deployment Automation

Continuous Deployment

Automated deployment pipeline:

yaml
# .github/workflows/deploy.yml
on:
  push:
    branches: [main]
jobs:
  deploy:
    runs-on: ubuntu-latest
    steps:
      - uses: actions/checkout@v3
      - name: Deploy DotClaude
        run: ./scripts/ci-deploy.sh

Scheduled Deployments

Regular configuration updates:

bash
# Crontab entry for weekly updates
0 2 * * 0 cd ~/dotfiles && ./scripts/update-all.sh

Post-Deployment Tasks

Verification Procedures

  1. Functionality Testing - Verify all features work
  2. Performance Monitoring - Check system performance
  3. Integration Testing - Ensure cross-package compatibility
  4. User Acceptance - Confirm user satisfaction

Documentation Updates

  • Update deployment logs
  • Record configuration changes
  • Document any issues encountered
  • Update user documentation

Monitoring Setup

  • Configure health monitoring
  • Set up performance alerts
  • Enable error tracking
  • Schedule regular checks

Rollback Procedures

Automatic Rollback

System detects issues and reverts:

bash
# Health check triggers rollback
./scripts/health-check.sh --auto-rollback

Manual Rollback

User-initiated reversion:

bash
# Rollback specific package
./scripts/restore.sh git 2024-06-18

# Full system rollback
./scripts/restore-all.sh 2024-06-18

Emergency Rollback

Critical system recovery:

bash
# Emergency restore to last known good
./scripts/emergency-restore.sh

# Nuclear option - restore all from backup
./scripts/restore-everything.sh --emergency

Deployment Troubleshooting

Common Issues

  • Permission Errors - Check file permissions and ownership
  • Symlink Conflicts - Resolve overlapping configurations
  • Dependency Issues - Ensure all requirements met
  • Configuration Errors - Validate syntax and settings

Diagnostic Commands

bash
# Check deployment status
./scripts/deployment-status.sh

# Validate configuration integrity
./scripts/validate-deployment.sh

# Debug deployment issues
./scripts/debug-deployment.sh --verbose

Recovery Strategies

  1. Partial Rollback - Revert problematic packages only
  2. Configuration Repair - Fix issues in place
  3. Clean Deployment - Remove and redeploy
  4. Emergency Recovery - Full system restoration

Best Practices

Planning

  • Always plan deployments during low-activity periods
  • Have rollback procedures ready
  • Test thoroughly in non-production environments
  • Communicate changes to users

Execution

  • Follow documented procedures exactly
  • Monitor system during deployment
  • Keep detailed logs of all actions
  • Verify each step before proceeding

Post-Deployment

  • Conduct thorough testing
  • Monitor system performance
  • Address any issues promptly
  • Update documentation and procedures

Built for the future of AI-assisted development